SoilDri SEM- Manual Mixing

1.Dig

Excavate the trench or pit to the required dimensions in line with the SWUK Protocol. Separate materials and retain arisings from the excavation, ensuring tarmac, oversized materials, and debris are removed before mixing.

2. Mixing Process

Spread the excavated material evenly on a suitable mixing spot board and apply SoilDri SEM at the recommended dosage rate, typically 2%, adjusted as necessary for the moisture content and soil type. Mix thoroughly until the material reaches a uniform consistency at its optimum moisture content, producing an improved, workable condition that is suitable for immediate reuse.(For saturated material see SEM+)

3. Install & Repair Apparatus

Carry out the installation or repair of the utility apparatus while the material is allowed to mellow. Once the apparatus is securely in place, the improved material will be ready for trench reinstatement as structural backfill, in compliance with S4 and S5 of SROH 2020.

4. BackFill & Compact

Place the SoilDri SEM improved clays and subsoils back into the excavation in controlled layers. Each layer should be compacted using appropriate equipment until the trench is reinstated to formation level in accordance with SROH A8, Resume with surfacing layers beginning from the sub-base, in accordance with HAUC specification (For sub-base application see SoilDri SB)