Project Overview
- Location: Barking Riverside, East London
- Development Name: Bellway London Parkway project
- Type of Project: Major regeneration scheme
- Scope: Transforming one of Europe’s largest brownfield sites into a vibrant, sustainable community
Groundworks Challenge
- Main Task: Statom Group reengineered 100,000m³ of earthworks material
- Issue Identified:
- Some soils had high moisture content
- This made it difficult to achieve the targeted compaction rate of 95%
Limitations of Traditional Methods
- Common Industry Practice: Quicklime is typically used to reduce soil moisture
- Why Quicklime Was Not Suitable:
- The site is near a residential area and a watercourse
- Quicklime posed environmental risks that were unacceptable for this location
- Ecological standards needed to be maintained
The Sustainable Alternative
- Supplier: SoilDri
- Product Used: SoilDri RC-26, part of the SoilDri RC Range
- Delivery & Use:
- Delivered to site within days
- Applied immediately on-site
Performance & Application
- Application Rate: 1.5% (comparable to quicklime)
- Volume Treated: 9,000 tonnes of wet material treated in-situ
- Moisture Reduction Achieved:
- Reduced from 31% to 23%
- Compaction Rate Achieved:
- Increased to 95–98%, exceeding the 95% target
Project Outcomes
- Technical Success:
- Enabled successful compaction of wet soils
- Supported on-schedule project delivery
- Environmental Benefits:
- Avoided risks associated with quicklime
- Aligned with site’s environmental standards
- Cost Efficiency:
- More cost-effective than traditional solutions
- Sustainable Impact:
- Demonstrated the effectiveness of an eco-friendly drying agent in a large-scale regeneration project
Conclusion
The use of SoilDri RC-26 played a crucial role in the success of the Bellway London Parkway project
The collaboration between Statom Group and SoilDri highlighted how innovative, environmentally responsible solutions can address complex construction challenges