JN Bentley Case Study – SoilDri RM

Denby Dale Wastewater Treatment Works – Case Study

Client: Yorkshire Water
Principal Contractor: JN Bentley Ltd
Location: Denby Dale, West Yorkshire
Service: Soil moisture reduction for environmentally sensitive site


Overview

JN Bentley Ltd is a leading UK-based civil engineering and construction company, founded in 1972 and headquartered in Skipton, North Yorkshire. They deliver a wide range of infrastructure projects, with particular expertise in the water and environmental sectors.

Yorkshire Water, in collaboration with JN Bentley, undertook a facility upgrade at the Denby Dale Wastewater Treatment Works in West Yorkshire. The site was located in a highly sensitive area, surrounded by streams, rivers and natural watercourses, requiring stringent environmental controls for materials handling and earthworks.

Traditional drying methods using quicklime posed risks to surrounding ecosystems due to caustic properties and the potential for pH spikes in soil and runoff.

Located at the south side of the site, heavily waterlogged ground made it impossible to compact or handle material effectively without risking project delays, increased export volumes, and excessive reliance on imported aggregates.


Challenges

  • Southern section subsoils were too saturated for safe compaction or movement without causing significant environmental disruption.
  • Risk of schedule delays, carbon-heavy logistics, and increased costs from export and aggregate import.
  • pH-sensitive rivers and watercourses meant traditional lime-based drying agents could breach compliance limits.

The Solution

The team engaged SoilDri to deliver a targeted solution using our RM range, engineered specifically for environmentally sensitive sites.

162 tonnes of SoilDri RM were applied directly to saturated soils, rapidly reducing moisture while maintaining full pH control.

RM’s unique formulation is designed for high moisture reduction with low embodied carbon, avoiding the caustic impact of traditional quicklime.

Material was treated on-site, enabling immediate reuse and eliminating the need for soil export or aggregate import.


The Results

  • Material Reuse: All 8,000 tonnes of soils remained on-site, eliminating haul-off and avoiding the export of and import of 9,200 tonnes of aggregate.
  • Transport Reduction: Nearly 2,000 fewer lorry movements, improving site safety and reducing local disruption and lowering haulage costs.
  • Carbon Savings: Over 35 tonnes of CO₂ saved through reduced vehicle movements, directly cutting emissions from haulage operations.
  • Cost Efficiency: Reduced spend on transport, landfill fees, and aggregate purchases while avoiding delay-related overheads.
  • Environmental Compliance: Maintained full pH control, preventing harmful runoff and ensuring works met strict environmental regulations.
  • Moisture Reduction: Delivered target moisture levels in saturated soils, producing a stable fill ready for compaction and immediate reuse.