This document outlines the newly approved Street Works UK material classification protocol and provides detailed guidance, practical examples, and context for its use in everyday street work activities. It is intended for utilities, contractors, and stakeholders involved in excavations, reinstatements, and other forms of street work, helping them understand how to manage excavated waste safely and in compliance with environmental regulations.

Why the change in how utilities classify excavated waste material

Historically, utilities undertaking street work in the UK had two different frameworks for classifying excavated waste. Unplanned works were typically classified according to RPS 211, whereas planned works followed the WM3 guidelines. While these approaches were functional, they presented challenges, particularly for unplanned works, where the nature of the waste was not always known in advance and could vary significantly between sites.

The Environment Agency requires that all excavated waste is classified correctly before it can be disposed of or treated. This ensures that waste management is safe, environmentally responsible, and legally compliant. However, the previous dual-system approach was not always practical for the fast-moving, often unpredictable nature of street work. Unplanned works could generate significant quantities of waste that needed rapid assessment to avoid delays in reinstatement and potential non-compliance.

To address these challenges, the Environment Agency invited Street Works UK to propose a solution specifically tailored for its members. The goal was to develop a practical, risk-based system that could be applied consistently across both planned and unplanned works, reducing complexity while maintaining environmental safety standards.

The new risk-based classification approach

Street Works UK trialled a risk assessment–based approach with its members, focusing on the types of waste typically encountered during street work. This trial involved evaluating soil, subsoils, and other excavated materials to identify any potential contaminants or environmental hazards before disposal or treatment. By applying a structured assessment, utilities can now classify waste on-site more efficiently, reducing delays in excavation and reinstatement processes while ensuring regulatory compliance.

The approach has been officially approved by the Environment Agency for use in qualifying works. It allows utilities and contractors to follow a standardised protocol across a range of street work scenarios, from minor repairs and maintenance to major infrastructure projects. The new system emphasises the importance of accurate on-site assessment, documentation, and reporting to support the safe management of excavated materials.

Benefits for street work operations

Implementing this approved classification protocol brings several key benefits to those involved in street work. First, it streamlines the waste management process, allowing contractors to manage excavated material more efficiently and reduce unnecessary storage or transport. Second, it improves environmental compliance, ensuring that waste is appropriately treated or disposed of in line with current regulations. Third, it enhances project planning by providing a clear framework for assessing waste risk before excavation begins, which can help reduce delays and unexpected costs.

Furthermore, the protocol supports sustainable practices within street work, encouraging the reuse of materials where possible and ensuring that potentially hazardous waste is identified and treated responsibly. By adopting a risk-based approach, utilities can take proactive measures to protect the public, workers, and the surrounding environment during excavation and reinstatement activities.

Practical guidance and examples

This document also provides practical guidance and examples to help users apply the classification protocol in real-world street work scenarios. It includes step-by-step procedures, checklists, and case studies demonstrating how the risk-based system can be implemented across different types of projects, including planned maintenance, emergency repairs, and large-scale utility installations.

By following the guidelines set out by Street Works UK, utilities, contractors, and other stakeholders can confidently manage excavated waste in a consistent, safe, and environmentally responsible manner. This new classification approach represents a significant step forward in standardising practices across the industry, improving compliance, and supporting efficient, high-quality street work throughout the UK.

For further information and case studies on how this protocol is applied in practice, refer to the full guidance provided by Street Works UK.