SROH S4/S5 Backfill – A Practical Guide to

SROH S4/S5

For utilities and civil engineering contractors, achieving compliance with the Specification for the Reinstatement of Openings in Highways (SROH) is a critical part of delivering successful reinstatement works. Sections S4 and S5 define the standards for materials used around apparatus and within trench backfill.

Failure to meet these requirements can result in failed inspections, costly rework, and delays to programme, all of which directly impact project performance and cost.

This guide explains what SROH S4/S5 require in practice, the common challenges faced on site, and how material improvement techniques can support compliance.

Understanding SROH S4 /S5 Requirements

The SROH, governed by the Highway Authorities and Utilities Committee (HAUC), sets out strict guidance to ensure reinstated highways perform to the same standard as the original structure.

S4 — Surround to Apparatus

S4 focuses on the material used immediately around buried services. This is a critical zone where protection and support are essential.

To comply, material must:

  • Be free from large or sharp stones that could damage apparatus
  • Provide uniform support to avoid stress points
  • Compact easily without segregation
  • Minimise the risk of void formation

Poor material selection in this zone can lead to long-term asset damage or failure.

S5 — Backfill Material

S5 relates to the reinstatement of the trench above the apparatus surround.

Backfill material must:

  • Be suitable for compaction in layers
  • Achieve the required density under site conditions
  • Limit air voids within the structure
  • Prevent differential settlement over time

Consistent compaction and moisture control are key to meeting these requirements.

The Challenge: Wet or Non-Compliant Excavated Material

On many utility projects, excavated arisings are intended to be reused as backfill. However, these materials frequently fail to meet S4/S5 requirements due to:

  • High moisture content, particularly in cohesive clays
  • Poor soil structure following excavation
  • Inconsistent grading and particle distribution
  • Reduced ability to compact effectively

Wet or unstable material can lead to excessive air voids and inadequate density, increasing the risk of settlement and inspection failure.

As a result, contractors often default to removing spoil and importing compliant backfill, a process that increases cost, generates waste, and adds unnecessary vehicle movements.

Supporting SROH Compliance with Soil Improvement

Improving excavated material in situ is a more efficient and sustainable approach, provided the method remains compliant with SROH and HAUC guidance.

Products such as SoilDri SEM are designed to address the primary issue affecting compliance, moisture content, without fundamentally altering the classification of the soil.

SEM works by:

  • Reducing excess moisture within the soil matrix
  • Improving workability and handling
  • Enhancing particle interlock for better compaction
  • Reducing the formation of air voids
  • Supporting consistent layer placement and compaction

Importantly, as a non-binding solution, it does not chemically stabilise or permanently alter the soil. This allows treated material to remain suitable for use within S4 and S5 applications where appropriate.

Practical Benefits for Utility Contractors

By improving rather than replacing excavated material, contractors can achieve both compliance and efficiency on site.

Key benefits include:

  • Reduced risk of failed SROH inspections
  • Lower likelihood of rework and associated costs
  • Faster reinstatement and programme certainty
  • Reduced reliance on imported aggregates
  • Lower waste disposal volumes
  • Decreased carbon impact from haulage and material production

This approach aligns with increasing industry focus on sustainability, without compromising technical performance.

Meeting SROH S4 and S5 requirements is not just about material selection, it is about ensuring consistent compaction, managing moisture, and maintaining control over reinstatement quality.

Wet or poor-quality spoil presents a common challenge, but it does not automatically need to be removed from site. With the right treatment approach, excavated materials can often be improved to meet compliance standards.

For utility contractors working under increasing cost and programme pressure, this represents a practical way to deliver compliant reinstatement while reducing environmental impact.

Speak to our technical team to understand how SEM can support your next project.